New Construction – 60,000 sf charter school, infill site.  Steel construction with some large clear spans and some complicated acoustical treatments.
KOW was retained at the end of pre-construction.  A contractor was already chosen, and it was discovered the original drawings had no coordination and could not be constructed as per the construction documents.  KOW assisted in procuring a consulting architect to work with the existing engineers to modify all drawings during the construction process and work through a design build scenario.
Original Budget – $26,520,000 / Current Budget $27,233,196.

Client

The Equity Project (TEP) Charter School – 153 Sherman Avenue, New York, NY

Our Role

Owner's Representative